HOME ADDITION CONSTRUCTION PHOTOS

BACK TO OHIO PAGE

8-23 TO 9-24-2004 PHOTOS Construction road is built, old house overhangs are removed, basement is dug, old footer removed, new basement footer is poured, basement ICF [Insulated Concrete Forms] are installed, basement ICF walls are pumped.

ICF WALL CONSTRUCTION VIDEO

9-29 TO 12-31-2004 PHOTOS Basement sewer line installed, foam floor installed, basement floor poured,wood sub-floor installed,first floor ICF are installed,first floor ICF walls are pumped, roof built, membrane roof material installed

JAN TO JUNE-2005 PHOTOS Mostly inside work during the winter. Hall Bathroom renovated,solar tube installed on roof, insulation installed, drywall hung, master bath tile installed

OCT 2005 FINAL PHOTOS OF THE LIVING ROOM FURNITURE, LANDSCAPING, HOME THEATER, SITTING ROOM, MASTER BATH, AND KITCHEN

PROJECT VENDORS AND SUPPLIERS